TM 5-5420-202-34
ENGINE REPLACEMENT
Replacement Engine Installation (Sheet 2 of 17)
REMOVAL:
1.
Using 1-1/8 inch wrench, loosen connection
(A). Remove line (B) from engine.
2.
Using hands, remove lead (C) from fuel
NOTE
Tag oil cooler tubes as they are
removed for later installation.
Removal of left and right side oil
cooler tubes are the same.
NOTE
When removing the oil cooler tubes,
remove the outer tube and its
adapter before removing the inner
tube and its adapter.
3.
Using 1-5/8 inch wrench to hold adapter
(E), use 1-1/2 inch wrench to remove
nut (F) securing outer tube (G). Pull
tube (G) towards transmission until it
is free of adapter (E).
4.
Using 1-5/8 inch wrench, remove outer
adapter (E) and washer (H) from oil
cooler (J).
Perform steps 3 and 4 to remove
5.
inner oil cooler tube (K), inner
adapter (E), and washer (H).
Go on to Sheet 3
3-58