TM 5-5420-202-34
ENGINE REPLACEMENT
Replacement Engine Installation (Sheet 1 of 17)
PROCEDURE INDEX
PROCEDURE
PAGE
3-57
Removal (Unserviceable Engine)
Cleaning
3-64
Installation (Replacement Engine)
3-65
TOOLS:
1-3/16 in. open end wrench
7/1 6 in. combination box and
5/8 in. combination box and
open end wrench (2 required)
open end wrench
7/8 in. combination box and
5/8 in. socket with 1/2 in. drive
open end wrench
5 in. extension with 1/2 in. drive
1 in. combination box and open
Flat-tip screwdriver
end wrench
Spanner wrench
1-1/8 in. open end wrench
Retaining ring pliers
1-1/2 in. open end wrench
Torque wrench with 1/2 in. drive
1-5/8 in. open end wrench
(0-175 lb-ft) (0-237 N .m)
9/16 in. socket with 1/2 in. drive
3/4 in. combination box and open end
1-1/8 in. socket with 1/2 in. drive
wrench
Hoist (5,000 pounds)
1/2 in. combination box and
open end wrench
SPECIAL TOOLS: Pinion turning wrench (Item 5, Chapter 2, Section I)
Engine and transmission sling (Item 1, Chapter 2, Section I)
Slide hammer puller (Item 3, Chapter 2, Section I)
FABRICATED TOOLS:
SUPPLIES:
Gasket
Preformed packing
Drain pan (suitable container)
REFERENCES:
TM 5-5420-202-20
LO 5-5420-202-12
PERSONNEL:
Two
Go on to Sheet 2
Change 2 3-57