TM 5-5420-209-12(7)(8)(9)(10)(11)Figure 2-31. Bay Ground Recovery (Sheet 1 of 4).Raise boom (10) to full aft position.Pay out cable (5) until hook (11) is 1-2 ft (.3 -.6 m) below lifting eye (12).Install hook (11) in lifting eye (12) with opening in hook facing transporter (2).Play in cable until tiedown pins (13) are 1-2 ft (.3 -.6 m) above tiedown hooks (4).Lower boom (10) until bay tiedown pins (13) are directly above tiedown hooks (4).2-109
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business