TM 5-5420-209-12
(7)
(8)
(9)
(10)
(11)
Figure 2-31. Bay Ground Recovery (Sheet 1 of 4).
Raise boom (10) to full aft position.
Pay out cable (5) until hook (11) is 1-2 ft (.3 -.6 m) below lifting eye (12).
Install hook (11) in lifting eye (12) with opening in hook facing transporter (2).
Play in cable until tiedown pins (13) are 1-2 ft (.3 -.6 m) above tiedown hooks (4).
Lower boom (10) until bay tiedown pins (13) are directly above tiedown hooks (4).
2-109