TM 5-5420-209-12Figure 2-30. Bay Water Recovery (Sheet 4 of 5).NOTEIf bay cable guide hole does not aline with locking cylinder pin, raise or lower boom, as needed or movetransporter to level ground and retry.(20) Engage (PIN IN) cylinder pin (4).NOTEEnsure both aft tiedown pins (9) are seated in aft tiedown hooks (1).2-106
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business