TM 5-5420-209-12
Figure 2-30. Bay Water Recovery (Sheet 4 of 5).
NOTE
If bay cable guide hole does not aline with locking cylinder pin, raise or lower boom, as needed or move
transporter to level ground and retry.
(20) Engage (PIN IN) cylinder pin (4).
NOTE
Ensure both aft tiedown pins (9) are seated in aft tiedown hooks (1).
2-106