Home
Download PDF
Order CD-ROM
Order in Print
Figure 2-15. Bay Controlled launch (Sheet 6 of 6).
Figure 2-16. High Bank Launch of Bay (Sheet 2 of 12).
TM-5-5420-209-12 Cargo Pallet Ribbon Bridge Transporter (NSN 5420-01-008-7436) Manual
Page Navigation
68
69
70
71
72
73
74
75
76
77
78
TM 5-5420-209-12
Figure 2-16. High Bank Launch of Bay (Sheet 1 of 12).
(3)
Ensure winch cable (6) is properly installed in lifting eye (7), cable guide (8) and around boom sheeve (9).
2-63