TM 5-5420-209-12
Figure 2-16. High Bank Launch of Bay (Sheet 4 of 12).
(13) Pay out cable until bay tiedown pins (15) are seated in tiedown hook (5).
(14) Pay out cable and remove cable (6) from cable guide (8).
(15) Raise boom (14)tovertical position and play in cable until bay tiedown pins (15) areapproximateiy 2 ft (0.60
m) above tiedown hooks (5).
(16) Raise boom (14) to full aft position and pay out cable and lower bay (18) to ground.
(17) Remove cable (6) from lifting eye (7).
(18) Lower boom (14) fully.
2-66