ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1I. Calculate HCalculate H, (for later comparison against N, see Figure 3-9). The value H is the height of the far bank atthe F peg relative to a baseline which is drawn through the RB and 0 pegs. The baseline extends from behindthe 0 peg on the near bank to a point beyond the F peg on the far bank.(a) For push launch.(b) For jack launchH = Elev F + Elev0x(.L+0.23m)H = Elev F +Elev0x(L-0.23m)R DistanceR DistanceFIGURE 3-9 Key Construction Points for SS 4-12 Baym. Launch designTABLE 3-10. SS Bridges 4 thru 8 Bays Launch Design4 Thru 8 Bays(from below)Choose a RB set-up and packing (if required) to give N > HRB set-up& packing(from columns g or h and Note 3)No. of Bays4N, BP only (g)1.30N, BP + DU ** (h)1.9851.141.9161.071.8370.761.14I80.38I1.07I3-23