ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
I. Calculate H
Calculate H, (for later comparison against N, see Figure 3-9). The value H is the height of the far bank at
the F peg relative to a baseline which is drawn through the RB and 0 pegs. The baseline extends from behind
the 0 peg on the near bank to a point beyond the F peg on the far bank.
(a) For push launch.
(b) For jack launch
H = Elev F + Elev 0 x (.L + 0.23 m)
H = Elev F + Elev 0 x (L - 0.23 m)
R Distance
R Distance
FIGURE 3-9 Key Construction Points for SS 4-12 Bay
m. Launch design
TABLE 3-10. SS Bridges 4 thru 8 Bays Launch Design
4 Thru 8 Bays
(from below)
Choose a RB set-up and packing (if required) to give N > H
RB set-up
& packing
(from columns g or h and Note 3)
No. of Bays
4
N, BP only (g)
1.30
N, BP + DU ** (h)
1.98
5
1.14
1.91
6
1.07
1.83
7
0.76
1.14
I
8
0.38
I
1.07
I
3-23