ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-113-13SINGLE STORY 9 thru 12 BAY DESIGN ON RESTRICTED SITESThe design procedures for SS bridges (9 through 12 bay) on restricted sites is the same as for normal sites exceptthat:a.The maximum R Distance during construction is 8.2 m, see Table 3-14.b.The launching nose length is increased by one launching nose heavy (LNH) section, see Table 3-14.c.Counterweights are required as described, see Table 3-14.TABLE 3-14.SS Bridges (9 through 12 bay) on Restricted SitesNo. of BaysR DistanceNose ConstCounterweights Required98.26N11 BSB, 3 Deck units, 2 Top panels108.26N11 BSB, 3 Deck units, 2 Top panels118.27N11 BSB, 3 Deck units, 4 Top panels128.27N11 BSB, 3 Deck units, 4 Top panels13-14DOUBLE STORY 2E + 1 thru 2E + 12 BAY DESIGNThe procedures that follow are for design of DS 2E + 1 thru 2E + 12 bay MGBs on normal sites only:a.Measure the AR Gap (para. 3-10a)b.Select a bridge (para. 3-10b and Table 3-15)TABLE 3-15.DS MGB Design 2E + 1 thru 2E +12 Bays Site and Bridge Dimensions2E + No. ofBridgeAR Gap RangesMLC*BaysLength LR DistanceNose Const(a)(b)(c)(d)(e)( f )6.4 - 9.0111.010.02N18.2 - 10.8212.811.910.0 - 12.6314.612.23N111.9 - 14.5416.513.113.7 - 16.3ALL518.314.915.5 - 18.1MLC620.114.94N117.3 - 19.970(T)721.915.819.2 - 21.8823.816.821.0 - 23.6925.617.75N122.8 - 25.41027.419.524.7 - 27.31129.320.46N126.5 - 29.11231.121.66N1* See step k. Slope Check and Table 1-1 for crossing restrictions and MLC 100(W) capability. (T) = Tracked3-26Change 2
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business