ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1n. Loads requiredFrom Table 3-12, determine the truck and trailer toads required for the bridge.TABLE 3-12. MGB Pallets SSPallet TypeErectionBridgeTotal4 - 5112No. of Bays6 - 78 - 91 0 - 1 2111234345N O T EAdditional vehicles are required to transport personnel. Erection pallets maybe partial depending on the bridge being built.o. Manpower and construction timeFrom Table 3-13, determine the manpower and construction time requirementsTABLE 3-13. Working parties and building times on good sites(a)Single Story Single Span4-5 Bays6-8 Bays9-1 2 Bays(b)(c)(d)Working party1 + 81 + 1 61+16Time by day (hours)1/23/41Time by night (hours)3/411 1/4NOTES:1. All timings exclusive of work on approaches.2. Add 20 percent for unskilled personnel.3. Add 30 percent for inclement weather.4. Add 30 percent for adverse site conditions.p. Final designDuring the preceding design process, the information necessary to fill in the blanks below would have beenobtained. Fill in these figures in the pro-forma, at this point the design is considered complete.a. No. of Baysb. LNCG Settingc. Set-up of RBand Packing Requiredd. Bearing : NBFBe. TruckTrailer Loadsf. Manpower Requiredg. Time to Construct3-25
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business