ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
(b)
Insert retainer clips through the end of each nose pin.
NOTE
This assembly Is now called the capsill roller beam (CRB).
(8)
Position capsill roller beam. Ensure that the center of capsill roller beam is over centerline of bridge. If it is
not, pull on baseplates until center of capsill roller beam is directly over capsill roller beam peg. Ensure that
capsill roller beam is at right angle (900) to centerline of bridge.
(9)
Assemble the front roller beam and rear roller beam (para. 4-5b.) and position these on site as shown.
Ensure both roller beams are centered over bridge centerline and at 900 to bridge centerline.
(10) Lower longitudinal girder at RRB [para. 4-5 b. step (12)].
(11) Set roller beams at required heights, level all roller beams (para. 4-5d.) and lock rollers (para. 4-5e.).
X (min.)
BRIDGE
9 ft (2.7m)
13-22 BAY LINK REINFORCED.
3 FT (0.9m)
13-22 BAY W/O REINFORCEMENT.
4-11