ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1(27) Lift jack hoods from jacks; secure jack hoods in top teeth of post.(28) Remove jacks and extend ram 10 in (25 cm).(29) Place jacks under posts and lower hood to jack head.(30) Operate jacks to raise the bridge from the packing. Remove no more than three layers of packing.(31) Continue this process, steps (25) to (30) until the bridge is lowered onto the bank.(32) Remove jack posts, packing and jacks.f.Jacking Down - Single Story over 8 Bay and All Double StoryAfter final launch and the far bank has been lowered using the landing roller pedestal, the drill for jacking down thehome bank is as follows:(1)On double story bridges ensure rollers on front roller beam and rear roller beam are locked.(2)On double story bridges lower roller beam to about 2nd pin hole from bottom.(3)Place lugs of jack posts in ramp ledge of bankseat beam (para. 4-20d.) or place wedge of jack postbetween post and bankseat beam (para. 4-20c.). Guide bottom of jack posts into brackets on outside ofbankseat beam. Pin jack posts to bankseat beam with nose pins put in from the inside of the bracket tothe outside. Secure nose pin with retainer clip.(4)Position two double story baseplates at end of bridge. Baseplates are placed end to end at centerline.4-78
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business