ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1(2)Pin link to bankseat beam with a nose pin and secure with a retainer clip.(3)Place two adjustable support baseplates about 6 in (15 cm) from final position of bankseat beam. Endsof baseplates butt together at centerline.(4)Place one davit upright on each baseplate with arrows pointing to outside of bridge. Use the levelingscrews or packing to ensure the davit pulleys are vertically in line with the jacking bracket pulleys 4-83from the front and the side.4-83
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business