ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1(3)Move bottom panel from under top panel.c.Removing Top Panels.(1)Place a second tie-down strap around panel point 7 of the next unstrapped bay.NOTEFrom this point on, these two straps will be moved along the bridge girder so there are always twostraps around the last two bays of bridge.(2)Remove retainer clip from panel pin in last top panel.(3)Unlock shoot bolts of the next four bottom panels.4-95
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business