• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
POWERPLANT REPLACEMENT - Continued
POWERPLANT REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -2 Page Navigation
  6    7    8    9    10  11  12    13    14    15    16  
img
TM 5-5420-226-20-2
POWERPLANT REPLACEMENT (Sheet 10 of 21 )
Using 1-1 /2 inch socket, loosen two
36.
screws (AK) at transmission mounts
(both sides).
Remove two screws (AK), lockwashers
37.
(AL), recessed washers (AM), and washers
(AN) securing two mounting brackets
to transmission mounts.
Check all disconnected rod and line
38.
ends to make sure they are out of way
during powerplant removal.
39.
Connect hoist hook to sling. Make sure
hoist hook is put through hole for power-
plant.
TA107441
Go on to Sheet 11
.
5-11


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.