• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
POWERPLANT REPLACEMENT - Continued
POWERPLANT REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -2 Page Navigation
  9    10    11    12    13  14  15    16    17    18    19  
img
.
TM 5-5420-226-20-2
POWERPLANT REPLACEMENT (Sheet 13 of 21)
INSTALLATION:
1.
Install six spring washers (A) (three each side)
on transmission mounts.
Make sure all surfaces in compartment are
2.
clean. If not, clean engine compartment.
Install final drive adapter hook-up tool in final
2.1
drive adapter splines with opening pointed Up
and slightly back (1 or 2 teeth from level
position).
Apply light coat of grease to contact surfaces
3.
of engine and transmission mounts.
NOTE
"T" end of sling should be toward front
(engine end of powerplant).
Make sure hoist hook is in powerplant hole of
4.
sling.
Using hoist, pick up sling and install, four
5.
chain hooks through four lifting eyes on
powerplant.
Ends of chain hooks should point toward outer
6.
side of powerplant.
Go on to Sheet 14
5-14
Change 4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.