TM 5-5420-226-20-2
TURBOSUPERCHARGER OIL DRAIN TUBE (LEFT BANK) REPLACEMENT (Sheet 3 of 3)
Position gasket (G) on flange (H).
9.
10.
Using socket, install two bolts (J) and two washers (K) to secure tube cylinder head oil
drain assembly.
11.
Using screwdriver, tighten six clamps (C) to secure hoses (A).
12.
13. Connect powerplant test (ground hop) equipment (page 5-25).
14.
Start engine and check oil drain line assembly for leaks.
15. Disconnect powerplant test (ground hop) equipment (page 5-25).
16.
End of Task
TA107564
6-96