• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BASKET/GAGE INDICATOR PANEL HARNESS REPLACEMENT - Continued
BASKET/GAGE INDICATOR PANEL HARNESS REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  357    358    359    360    361  362  363    364    365    366    367  
img
TM 5-5-5420-202-20-3
TM 5420-226-20-3
BASKET/GAGE INDICATOR PANEL HARNESS REPLACEMENT (Sheet 3 of 6)
8.
Using 7/16 inch socket, remove screw
(W) and lockwasher (X) securing clamp
(Y) and harnesses (A), (Z), and (AA) to
overhead crossbeam (AB).
Using 7/16 inch socket, remove screw (AC)
9.
and lockwasher (AD) from clamps (AE)
and (AF) and harnesses (A), (Z), and (AA)
to overhead crossbeam (AB).
10.
Using 7/16 inch socket, remove screw
(AG) and lockwasher (AH) from clamps
(AJ) and (AK) and harnesses (A), (Z),
and (AL) to overhead crossbeam (AB).
11.
At operator's station, disconnect harness
(A) from powerplant warning lamp (AM).
Remove basket/gage indicator panel
12.
wiring harness (A) from behind straps
(H) and out of clamps (D), (V), (Y),
(AE), (AF), (AJ), and (AK).
Remove harness (A) from vehicle.
13.
Go on to Sheet 4
Change 6
10-296.59
5-61


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.