• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BASKET/GAGE INDICATOR PANEL HARNESS REPLACEMENT - Continued
BASKET/GAGE INDICATOR PANEL HARNESS REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  359    360    361    362    363  364  365    366    367    368    369  
img
TM 5-5420-202-20-3
TM 5-5420-226-20-3
BASKET/GAGE INDICATOR PANEL HARNESS REPLACEMENT (Sheet 5 of 6)
At back side of gage indicator panel,
5.
use spanner wrench to connect harness
connector (J) to gage indicator panel
connector.
6.
Using 7/16 inch socket and 7/16 inch
wrench, install screw (K), three new star
washers (L), and nut (M) securing ground
lead (N) to gage indicator panel.
Connect electrical leads (P) and (Q) (CKT 27).
7.
8.
Using 7/16 inch socket, install screw (R) and new lockwasher (S) securing ground leads
(N) and (T) and clamp (U) to center post.
Go on to Sheet 6
Change 6
10-2963 1
5-6.6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.