TM 5-5420-226-20-3
LEFT AND RIGHT FINAL DRIVE REPLACEMENT (Sheet 1 of 4)
PROCEDURE INDEX
.
PAGE
PROCEDURE
Removal
Installation
Hoist (capable of 1100 lb. minimum capacity)
TOOLS:
Pinch bar
Socket wrench handle with 3/4 in. drive
1-1/2 in. socket with 3/4 in. drive
9 in. extension with 3/4 in. drive
Torque wrench with 3/4 in. drive (0-600 lb-ft) (813 Nm)
36 in. extension bar
Knife, putty
Hand impact wrench set
Gloves (Item 72, Appendix D)
Sealing compound (Item 27, Appendix D)
SUPPLIES:
Goggles (Item 71, Appendix D)
Lubricating oil (Item 44, Appendix D)
Self-locking nuts (17 required)
Small brush (Item 10, Appendix D)
Dry cleaning solvent (Item 55, Appendix D)
Rags (Item 65, Appendix D)
Two
PERSONNEL:
REFERENCES:
PRELIMINARY PROCEDURES:
Drain oil from final drive (LO 5-5420-226-1 2)
Go on to Sheet 2