TM 5-5420-226-20-3
HUB ASSEMBLY REPLACEMENT (Sheet 1 of 7)
PROCEDURE INDEX
PAGE
PROCEDURE
Disassembly
Cleaning and Inspection
Assembly
9/16 in. socket with 1/2 in. drive
TOOLS:
Drift punch
Hammer
Hinged bar with 1/2 in. drive
2-1/2 in. socket with 3/4 in. drive
Pinch bar
Torque wrench with 3/4 in. drive (0-600 lb-ft) (0-814 Nm)
Long round nose pliers
SPECIAL TOOLS:
Face Wrench Socket (Item 28, Chapter 3, Section I)
Seal Inserter (Item 21, Chapter 3, Section 1)
Manual Control Handle (Item 11, Chapter 3, Section I)
Bearing Inserter Set (Item 17, Chapter 3, Section I)
Bearing Inserter Set (Item 16, Chapter 3, Section I)
SUPPLIES:
Grease (Item 37, Appendix D)
Gaskets
Seal
Bearing nut lock
Preformed packing
REFERENCES:
PRELIMINARY PROCEDURES:
DISASSEMBLY:
1. Using 9/16 inch socket, remove
and washers (C).
2. Remove cover plate (D) and gasket
(E). Discard, gasket (E),
Go on to Sheet 2
Change 3