TM 5-5420-226-20-3
COMPENSATING IDLER HUB AND ARM REPLACEMENT (Sheet 3 of 3)
INSTALLATION:
1. Grease new packing (A). Install it to groove
in idler arm mount.
2.
Using three technicians, lift hub and arm
assembly (B) to mounting position.
3. Push arm of assembly (B) into mount opening.
4. Aline holes in grease seal retainer (C) with
mounting holes on hub (D).
Using socket, and extension with torque
6.
wrench, tighten screws (F) to 140-165
lb-ft (190-224 N m).
TA169319
End of Task