TM 5-5420-227-24
Section l. MECHANICAL AND MISCELLANEOUS PROCEDURES
RESERVOIR QUADRANT BLOWER ASSEMBLY REPLACEMENT {Sheet 1 of 5)
PROCEDURE INDEX
PAGE
PROCEDURE
I
Removal
Installation
TOOLS: 3/16 in. socket head screw key (allen wrench)
5/16 in. socket head screw key (allen wrench)
3/8 in. socket head screw key (allen wrench)
7/16 in. combination box and open end wrench
3/4 in. socket with 1/2 in. drive
Flat-tip screwdriver
Putty knife
3/8 in. combination wrench
1-1/8 in. open end wrench
Hammer
Gasket
SUPPLIES:
PERSONNEL:
Two
REFERENCE:
PRELIMINARY PROCEDURE:
REMOVAL
1.
Using 3/8 inch screw key, remove
four screws (A) from cover (B).
2.
Manually remove cover (B).
TA170230
Go on to Sheet 2
3-2