• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
'TM 5-5420-227-24' by LOGSA - Page 461 of 574
'TM 5-5420-227-24' by LOGSA - Page 463 of 574

Launcher M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicie-Launched Scissoring Type, Class 60 Page Navigation
  445    446    447    448    449  450  451    452    453    454    455  
img
. . .
TM 5-5420-227-24
VALVE BANK ASSEMBLY AND BRACKETS REPLACEMENT (Sheet 2 of 17)
REFERENCE:
LO 5-5420-226-12
PRELIMINARY PROCEDURES:
Remove front quadrant (page 3-39)
Remove valve bank assembly control levers (page 3-117)
REMOVAL:
NOTE
Cap all lines and fittings when disconnected. Use rags and
drip pans to catch hydraulic fluid trappad in lines. Tag
lines for installation.
Go on to Sheet 3
TA170530
4-54


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.