TM 5-5420-227-24
VALVE BANK ASSEMBLY AND BRACKETS REPLACEMENT (Sheet 1 of 17)
PROCEDUREINDEX
PAGE
PROCEDURES
I
Removal
Cleaning and Inspection
Installation
TOOLS:
15 in. adjustable wrench
7/16 in. combination box and open end wrench
1/2 in. combination box and open end wrench
9/16 in. combination box and open end wrench
5/8 in. combination box and open end wrench
11/16 in. combination box and open end wrench
3/4 in. combination box and open end wrench
7/8 in. combination box and open end wrench
15/16 in. combination box and open end wrench
1-1/4 in. open end wrench
1-3/8 in. open end wrench
1-1/2 in. open end wrench
10 in. pipe wrench
7/16 in. socket with 1/2 in. drive
1/2 in. socket with 1/2 in. drive
3/4 in. socket with 1/2 in. drive
1/4 in. socket head screw key
5/16 in. socket head screw key
3/8 in. socket head screw key
SUPPLIES:
Drip pans
Preformed packing (11 required)
Caps and plugs (assorted sizes)
Identification tags
Lockwashers (4 required)
Lockwashers (6 required)
Pencil
Two
PERSONNEL:
Go on to Sheet 2
4-53