TM 5-5420-228-24
HEU HOSE ASSEMBLY "CB" REPLACEMENT (Sheet 1 of 2)
PROCEDURE INDEX
Procedures
Page
Removal
Installation
TOOLS:
12-in. Adjustable wrench
15/16 in. open end wrench
SUPPLIES:
Drip pans (suitable containers)
Protective caps and plugs (assorted sizes)
Preformed packing (as required)
REFERENCE: LO-12
PRELIMINARY PROCEDURES:
REMOVAL:
NOTE
Use rags and drip pans to catch excess hydraulic fluid. Cap or plug all lines and
fittings as they are disconnected.
1.
Hold depressurization manifold elbow (A) with adjustable wrench and use wrench to disconnect hose "CB" (B)
from elbow (A).
2.
Hold locking cylinder tee (C) with adjustable wrench and use wrench to disconnect hose "CB" (B) from tee (C)
and remove hose (B).
3.
Use adjustable wrench to remove elbow (A) from depressurization manifold (D). Remove preformed packings (E).
E
Go on to Sheet 2