Table 1. Operator Preventive Maintenance Checks and Services (PMCS)
for Interior Bay (Contd).
ITEM TO
NOT FULLY
ITEM
CHECK/
MISSION
NO.
INTERVAL
SERVICE
PROCEDURE
CAPABLE IF:
TM 5-5420-278-10
0016 00
0016 00-21
42
After
Roadways and
walkways
a. Check to ensure that all dirt, mud,
snow, ice, and debris are removed.
b. Check for physical damage.
b. Damage allows
water to enter
pontons. Any visible
hole will deadline
bay.
CAUTION
Ensure all gravel, rocks, mud, and
other debris are removed from
openings at unfolding stabilizer
mounting brackets prior to folding
bay. Failure to comply may result
in jamming during folding
operations.
NOTE
The time requirement to
complete After operation
PMCS is 10 minutes per
interior bay.
Refer to WP 0053 00 for
power wash pump operating
instructions.
NOTE
Perform the following After
operation checks when bay is
recovered and secured to
CBT.
If more than four gallons of
water (approx.) can be
drained from any one ponton
with bay in the water less
than eight hours, notify unit
maintenance to perform leak
test.
43
After
Bay couplings
Check for physical damage.
Coupling cannot be
engaged properly in
receptacle.