BAP
Winch
Hold-
Frame
Front Pin Locks
down
Lock
Rear
Center
Transload
Fluid
CONDITION
Locks1
Levers2
Lock
Jaw3
Latch3
Guides
Roller
Rollers
PLS Feet
Lines
TM 5-5420-278-10
0018 00
0018 00-2
CBT PREPARATION FOR USE (Contd)
1
Free Bridge
IN
DOWN
UP
CLOSED
N/A
OUT
UP
STOWED
STOWED
ENGAGED
Bay Launch
2
Controlled
IN
DOWN
DOWN
N/A
DOWN
OUT
DOWN
STOWED
STOWED
ENGAGED
Bridge Bay
Launch
3
Water Bridge
IN
DOWN
DOWN
CLOSED
UP
MID
DOWN
STOWED
STOWED
ENGAGED
Bay Retrieval
4
Unload Bridge
IN
DOWN
DOWN
N/A
DOWN
OUT
DOWN
STOWED
STOWED
ENGAGED
Bay to Ground
5
Load Bridge
IN
DOWN
DOWN
CLOSED
UP
MID
DOWN
STOWED
STOWED
ENGAGED
Bay from
Ground
6
Load BAP
OUT
UP
UP4
CLOSED4
N/A
MID4
DOWN
STOWED
STOWED
STOWED
from Ground
7
Unload BAP
OUT
UP
UP4
CLOSED4
N/A
MID4
DOWN
STOWED
STOWED
STOWED
to Ground
8
Transport
IN
UP/DOWN
UP
CLOSED4
N/A
MID5
DOWN
STOWED
STOWED
EITHER
Mode
9
Transload BAP OUT
UP
UP
CLOSED4
N/A
MID5
DOWN
DOWN6
STOWED
STOWED
to Trailer
10
Transload BAP OUT
UP
UP
CLOSED4
N/A
MID5
DOWN
DOWN7
STOWED
STOWED
to Truck
11
Load/unload
OUT
UP
UP
CLOSED
N/A
MID
DOWN
DOWN
DOWN
STOWED
BAP on PLS
Truck
Table 1. BAP Locks Checklist.
This table shows the various positions locks should be in for all BAP operations.
1BAP hold-down locks are located on the transporter.
2UP is locked on the BAP; DOWN is locked on the
LHS hook arm.
3Jaw and latch.
4N/A for an empty BAP.
5IN for an empty BAP.
6Moved to UP position after the BAP is fully on
trailer.
7Moved to STOWED position after the BAP is fully on
truck.
END OF WORK PACKAGE
c. Ensure Unit maintenance has serviced the vehicle; refer to DA Form
2404/5988-E, Equipment Inspection and Maintenance Worksheet.
d. Perform all operator/crew Before PMCS procedures as listed in WP 0014, table
1, prior to operating the CBT.
e. Review the BAP Locks Checklist, WP 0018, table 1, prior to performing BAP
operations for each condition.