TM 5-5420-278-100019 000019 00-10BAYS BOATSBRIDGE LENGTHLAUNCH SITESFEET (METERS)RAMPINTERIORDESIREDNEEDDESIRED87.8 (26.78) 2 2 2 3 4109.8 (33.48) 2 3 2 4 4131.8 (40.19) 2 4 2 4 5153.8 (46.89) 2 5 2 5 5175.8 (53.60)26356197.8 (60.30)27366219.8 (67.01)28367241.8 (73.71)29367263.8 (80.42)210377Additional(Note 1)0–66 (20)–1–3–11Additional(Note 2)0–88 (26.8)–1–3–11Additional(Note 3)0–132 (40)–1–3–11SITE REQUIREMENTS AND LAYOUTS (Contd)Table 2. Bridge Assembly Requirements.Notes:1.In currents of 6–8 feet (1.8–2.4 m) per second: for each additional bridgelength, increase of 0–66 feet (0–20.1 m). Add the indicated number of boats.2.In currents of 3–6 feet (91.4 cm–1.8 m) per second: for each additional bridgelength, increase of 0–88 feet (0–26.8 m). Add the indicated number of boats.3.In currents up to 3 feet (91.4 cm) per second: for each additional bridgelength, increase of 0–132 feet (0–40.2 m). Add the indicated number of boats(includes the safety boat, but not the backup boats).
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business