TM 5-5420-278-10
0022 00
0022 00-2
LOADING BAY FROM GROUND (Contd)
WARNING
The winch frame must be locked to the LHS hook arm
prior to loading the bay from the ground. Failure to
comply may result in damage to equipment or injury to
personnel.
NOTE
When both levers are in the DOWN position, the winch
frame is locked to the LHS hook arm. Perform steps d
and e if levers are in the UP position.
d. Remove quick-release pin (5) from stud (3) at both sides of winch frame (4).
e. Swing lever (2) down so that end of stud (1) is through hole in lever (2), and
install quick-release pin (5) on stud (1) at both sides of winch frame (4).
NOTE
Perform steps f and g if BAP winch hoses are not
connected to the LHS couplings.
f. Disconnect winch hoses (9) and (8) from stowage couplings (10) and (7), located
on winch frame bracket (6).
CAUTION
Ensure BAP winch hydraulic hoses are routed so that
they are free to move with the LHS hook arm or
damage to hoses will result.
g. Connect winch hydraulic hoses (8) and (9) to LHS couplings (13) and (11),
located on LHS hook arm (12).
1
2
3
4
5
9
11
12
13
8
6
7
8
9
10