TM 5-5420-278-10
0026 00
0026 00-3
HIGH-BANK LAUNCH OF BAY (Contd)
NOTE
Perform steps g and h if BAP winch hoses are not
connected to LHS couplings.
g. Disconnect winch hoses (10) and (9) from stowage couplings (11) and (8),
located on winch frame bracket (7).
CAUTION
Ensure BAP winch hydraulic hoses are routed so they
are free to move with LHS hook arm or damage to
hoses will result.
h. Connect winch hydraulic hoses (9) and (10) to LHS couplings (13) and (12),
located on LHS hook arm (14).
10
11
7
8
9
10
14
9
13
12