TM 5-5420-278-10
0026 00
0026 00-8
HIGH-BANK LAUNCH OF BAY (Contd)
aa. Back up CBT until BAP rear rollers (1) are approximately 68 in. (1520 cm)
from side of bay, then apply service brake (4), move transmission selector
lever (3) to N (neutral), and pull PARKING BRAKE control (2) out.
1
2
4
3
WARNING
Do not connect IRB hoisting gear to bridge rafting
bracket mounting holes and quick-release pins. Use
only the load receiving pins with one chain hook at each
pin. Failure to comply may result in damage to
equipment or possible injury or death to personnel.
NOTE
Perform step ab if launching an interior bay or perform
steps ac and ad if launching a ramp bay.
ab. Using full length
connect four hooks
(7) to load
(10) are closed.
7
7
6
5
8