TM 5-5420-278-100032 000032 00-2INTERIOR BAY TO INTERIOR BAY CONNECTION (Contd)WARNINGKeep hands clear of space between bays when closinglongitudinal upper couplings and do not place fingersunder couplings when closing them, or serious injury topersonnel may result.NOTEBay-to-bay connection is easier if BEB crew makeswaves to create movement.Upper couplings are closed when levers are fully downin receptacle blocks of adjacent bay.c. When bays are together, close two longitudinal upper couplings (1) oninterior bays (2) and (4).CAUTIONThe top of lower lock-drive jackscrew must be 3/4 in.(1.9 cm) below top surface of roadway for lower lock-drive pin to be fully engaged. Failure to ensurejackscrew is 3/4 in. (1.9 cm) below top surface ofroadway may result in damage to equipment.NOTEIf engagement of lower lockpin is difficult, have bridgeboat apply power forward or reverse and use crowbar toraise or lower bay as needed.d. Install T-wrench on jackscrew (3) of lower lock-drive, and turn T-wrenchclockwise until lower lock-drive pin is fully engaged, then back-out jackscrew(3) one full rotation.e. Repeat step d for opposite lower lock-drive.1234CROWBARCROWBART-WRENCHEND OF WORK PACKAGE
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business