TM 5-5420-278-10
0035 00
0035 00-31/32 blank
END OF WORK PACKAGE
BRIDGE ANCHORAGE (Contd)
INSTALLATION OF AN OVERHEAD CABLE ANCHORAGE SYSTEM (Contd)
SAG
1
2
3
4
5
FINAL POSITION
SLACK POSITION
RIVER LEVEL
NOTE: VERTICAL DISTANCES ARE EXAGGERATED.
MARKER
LINE OF
SIGHT
Figure 20. Measurement of Initial Sag.
Figure 21. Bowline.
Bowline. To tie a bowline knot, refer to the five steps illustrated in
figure 21.