TM 5-5420-278-100050 0000-112345PREPARATION FOR EMERGENCY MANUAL REMOVAL OF BAPCAUTIONMain frame of LHS must be in its fully stowed position.Attempting to lift BAP with main frame not stowedcould result in damage to equipment.NOTEManual mode operations using cab control box are to beperformed only when normal AUTO mode electriccircuit is malfunctioning.This procedure is performed when a loaded BAP mustbe removed using a crane or other handling system andmust be down with the help of a higher maintenancelevel.a. Ensure LHS main frame is fully stowed (down). If LHS main frame is notfully stowed, lower LHS main frame by following solenoid manual bypassprocedure (WP 0049 00, Manually Bypassing Solenoid During Electric PowerLoss).WARNING Winch frame must be locked to BAP prior to unloadingBAP to ground or damage to equipment or injury topersonnel may result. NOTEWhen both levers are in UP position, winch frame islocked to BAP. Perform steps b and c if levers are in theDOWN position.b. Remove quick-release pin (2) from stud (4) at both sides of winch frame (3).c. Swing lever (5) up so that end of stud (1) is through hole in lever (5), andinstall quick-release pin (2) on stud (1) at both sides of winch frame (3).
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business