TM 5-5420-278-10
0062 00
0062 00-2
PRELIMINARY SERVICING OF EQUIPMENT
Perform the following tasks prior to releasing the equipment for use:
1. Perform preventive maintenance checks and services (PMCS) (WP 0014 00, WP
0015 00, and WP 0016 00) to verify all component assemblies and subassem-
blies are complete, in proper working order, and lubricated where required.
2. Check all exterior surfaces of equipment for dirt, grease, oil, or any other
existing debris. Clean bay as necessary. (Refer to WP 0066 00.)
3. Check all basic issue items (BII) (WP 0070 00 and WP 0044 00) to ensure they
are present, in good condition, and properly mounted or stowed.
4. Check maintenance schedule for transporter and perform PMCS and
lubrication on transporter and truck chassis as required. (Refer to
TM 5-5420-234-14&P.)
END OF WORK PACKAGE