TM 5-5420-278-100010 000010 00-5RAMP BAY CONTROLS AND INDICATORS (Contd)HANDRAILS — There is a handrail rope supported by two fold-upstanchions mounted on the splash plate at each side of the IRB-R. To set upthe handrail, pull each stanchion out and away from the mounting bracketand stowage catch, then lift the stanchion up; a spring will automatically setthe stanchion into the mounting bracket once the stanchion is vertical. Tostow the handrail down, lift each stanchion up and out of the mountingbracket, fold down, then release. Make sure the stowage catch is secure. Whenbays are connected, the handrail ropes are joined by connecting the snaphookstogether. Press the lever on either snaphook to disconnect ropes.HROPELEVERSNAPHOOKSTANCHIONMOUNTINGBRACKETHANDRAIL, STOWED POSITIONSTOWAGE CATCHH
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business