TM 5-5420-278-24&P
0032 00
0032 00-1
UNIT MAINTENANCE INSTRUCTIONS
IMPROVED RIBBON BRIDGE (IRB)
RAMP BAY M16
NSN 5420-01-470-5825 P/N 12478918;
INTERIOR BAY M17
NSN 5420-01-470-5824 P/N 12478919.
DRAINING AND FILLING PUMP SYSTEM
PUMP, CYLINDER
INITIAL SETUP:
Tools and Special Tools
General mechanics tool kit
(Item 3, WP 0135 00)
Materials/Parts
Drain hose assembly (Item 6, WP 0074 00)
Gasket (WP 0108 00)
Fluid (Item 17, WP 0134 00)
Cap and plug set (Item 5, WP 0134 00)
References
WP 0001 00
WP 0038 00
Equipment Condition
Ramp bay removed from transporter
(TM 5-5420-278-10).
Inner pontons separated, if necessary
(WP 0023 00).