UNIT MAINTENANCE INSTRUCTIONS
IMPROVED RIBBON BRIDGE (IRB)
RAMP BAY M16
NSN 5420-01-470-5825 P/N 12478918;
INTERIOR BAY M17
NSN 5420-01-470-5824 P/N 12478919.
HOSE ASSEMBLIES AND FITTINGS REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
General mechanics tool kit
(Item 3, WP 0135 00)
Materials/Parts
Gasket (WP 0113 00)
Two lockwashers (WP 0112 00)
O-ring (WP 0113 00)
Twelve O-rings (WP 0113 00)
Teflon pipe sealant (Item 15, WP 0134 00)
Cap and plug set (Item 5, WP 0134 00)
Grease (Item 11, WP 0134 00)
Fluid (Item 17, WP 0134 00)
References
WP 0001 00
WP 0038 00
Equipment Condition
Ramp bay removed from transporter
(TM 5-5420-278-10).
Inner and outer pontons unfolded or separated
(WP 0023 00).
Fluid system drained (WP 0032 00).
Pump removed (WP 0035 00).