TM 5-5420-278-24&P
0038 00
0038 00-1
UNIT MAINTENANCE INSTRUCTIONS
IMPROVED RIBBON BRIDGE (IRB)
RAMP BAY M16
NSN 5420-01-470-5825 P/N 12478918;
INTERIOR BAY M17
NSN 5420-01-470-5824 P/N 12478919.
BLEEDING PUMP SYSTEM
PUMP, CYLINDER
INITIAL SETUP:
Tools and Special Tools
General mechanics tool kit
(Item 3, WP 0135 00)
Drain hose assembly (Item 6, WP 0074 00)
Materials/Parts
Fluid (Item 17, WP 0134 00)
Equipment Condition
Ramp bay removed from transporter and unfolded
(TM 5-5420-278-10).
Inner pontons separated, if necessary (WP 0023 00).