TM 5-5420-278-24&P0040 000040 00-2CABLE ASSEMBLY MAINTENANCE (Contd)NOTERemoval, installation, and adjustment of cable assemblies areperformed the same way for both sides. Left side is shown.REMOVALWARNINGAll personnel must stand clear during lifting operations. Ensureponton foldlocks and travel latches are in good mechanicalcondition and securely locked prior to lifting bay. Failure tocomply may result in damage to equipment or injury to personnel.1.Using transporter or suitable lifting device, raise bay (1) and position dunnage lengthwise undercenter of interior pontons (2).NOTEPerform step 2 if replacing spring or turnbuckle bolt eye.2.Remove spring pin (8) from spring (11).3.Loosen two jamnuts (12) on bolt eye (9) and wire cable end (7), and turn nut (13) clockwise untiltension is released from wire cable (6).4.Straighten and remove cotter pin (5) from pin (4), and remove pin (4) and wire cable (6) frombellcrank (3). Discard cotter pin (5).5.Disconnect spring (11) from bolt eye (9) and stabilizer lever (10). Remove wire cable (6) from bay (1).6.Perform steps 1 through 5 to remove cable assembly from opposite side.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business