TM 5-5420-278-24&P
0041 00
0041 00-2
EYEBOLT REPLACEMENT (Contd)
NOTE
Removal and installation of the two eyebolts are performed the
same way.
REMOVAL
1.
Remove two cotter pins (3), washers (5), and pin (17) from shaft of bellcrank (11). Discard cotter
pins (3).
2.
Remove two locknuts (7) and screws (14) from links (4), and remove cover (2) from inner ponton
brackets (13). Discard locknuts (7).
3.
Remove locknut (16) and screw (6) from collar (15) and shaft of bellcrank (11), drive bellcrank (11)
forward, and remove collar (15) from bellcrank (11). Discard locknut (16).
NOTE
Note location and quantity of shims for installation.
4.
Remove bellcrank (11) from inner ponton hinges (9) and (12), and remove
shims (8).
5.
Remove spring pin (18), pin (1), and two links (4) from cover (2).
6.
Perform steps 1 through 5 to remove eyebolt at opposite end of bay.
INSTALLATION
1.
Install two links (4) on cover (2) with pin (1) and spring pin (18).
2.
If moved, align inner pontons (10) using lifting device and sling.
NOTE
Apply a light coat of grease to shims, pin, and shaft of bellcrank
at installation.
3.
Position two shims (8) between hinges (9) and (12), and install bellcrank (11) halfway.
4.
Position collar (15) over shaft of bellcrank (11), and push bellcrank (11) in all the way.
5.
Install collar (15) on bellcrank (11) with screw (6) and new locknut (16).
6.
Install cover (2) on shaft of bellcrank (11) with pin (17), two washers (5), and new cotter pins (3).
7.
Connect two links (4) to inner ponton brackets (13) with two screws (14) and new locknuts (7).
8.
Perform steps 1 through 7 to install eyebolt at opposite end of bay.
9.
Install cable assembly (WP 0040 00).