TM 5-5420-278-24&P0041 000041 00-2EYEBOLT REPLACEMENT (Contd)NOTERemoval and installation of the two eyebolts are performed thesame way.REMOVAL1.Remove two cotter pins (3), washers (5), and pin (17) from shaft of bellcrank (11). Discard cotter pins (3).2.Remove two locknuts (7) and screws (14) from links (4), and remove cover (2) from inner pontonbrackets (13). Discard locknuts (7).3.Remove locknut (16) and screw (6) from collar (15) and shaft of bellcrank (11), drive bellcrank (11)forward, and remove collar (15) from bellcrank (11). Discard locknut (16).NOTENote location and quantity of shims for installation. 4.Remove bellcrank (11) from inner ponton hinges (9) and (12), and remove shims (8).5.Remove spring pin (18), pin (1), and two links (4) from cover (2).6.Perform steps 1 through 5 to remove eyebolt at opposite end of bay.INSTALLATION1.Install two links (4) on cover (2) with pin (1) and spring pin (18).2.If moved, align inner pontons (10) using lifting device and sling.NOTEApply a light coat of grease to shims, pin, and shaft of bellcrankat installation.3.Position two shims (8) between hinges (9) and (12), and install bellcrank (11) halfway.4.Position collar (15) over shaft of bellcrank (11), and push bellcrank (11) in all the way.5.Install collar (15) on bellcrank (11) with screw (6) and new locknut (16).6.Install cover (2) on shaft of bellcrank (11) with pin (17), two washers (5), and new cotter pins (3).7.Connect two links (4) to inner ponton brackets (13) with two screws (14) and new locknuts (7).8.Perform steps 1 through 7 to install eyebolt at opposite end of bay.9.Install cable assembly (WP 0040 00).
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business