TM-5-5420-279-10
Crane Stabilizer Leg Controls
3.14.4.4
Using the boom raise - lower controls (2) lift the boom from the docking bracket until the
jib can be folded out with no risk of accident.
3.14.4.5
Use the jib fold/unfold control to unfold the crane jib (3).
3.14.4.6
Using the jib extension extend/retract control extend the crane arm (4).
Crane Boom and Jib Controls
3-110