Operate the lift controls on the crane and raise the 1st parallel module. Make sure the
4.9.3.3
module opens slowly and progressively as it is lifted by the crane.
4.9.3.4
Continue to operate the lift and traverse controls on the crane, and using the tag lines,
guide the 1st parallel module into position on the launch vehicle.
WARNING
TAIL LIFT OPERATION. THE TAIL LIFT IS DESIGNED TO CARRY A MAXIMUM OF FOUR
PERSONS (500KG (1102.31LBS)). DO NOT OVERLOAD THE TAIL LIFT OR PERSONS
COULD BE KILLED OR INJURED AND THE TAIL LIFT DAMAGED IN THE EVENT OF A
FAILURE.
CRUSH INJURY. RAISING THE TAIL LIFT WITH THE GUARD RAILS ERECTED MAY
CAUSE A TRAPPING HAZARD. KEEP ALL LIMBS CLEAR DURING TAIL LIFT MOVEMENT.
CAUTION
The tail lift is designed to carry a maximum of four persons (1102.31 lbs (500 kg)). Do not
overload the tail lift. The tail lift will be damaged in the event of a failure.
4.9.3.5
Position 3 personnel on the tail lift, one at each end and one in the middle.
4.9.3.6
Remove the walk way fitted at the launch frame end of the slide frame.
4.9.3.7
On the tail lift pendant, press and hold the LIFT UP switch.
Make sure the lift
hydraulic cylinders extend and raise the tail lift platform.
Tail Lift Pendant
4.9.3.8
Release the LIFT UP switch when the tail lift platform positions the pinning operatives
at their convenient height.