TM-5-5420-279-10
4.9.3.38
On the tail lift pendant, press and hold the LIFT UP switch.
Make sure the lift
hydraulic cylinders extend and raise the tail lift platform.
Tail lift Hand Control
4.9.3.39
Release the LIFT UP switch when the tail lift platform positions the pinning operatives
at their convenient height.
WARNING
CRUSH HAZARD. DEATH OR SEVERE INJURY COULD RESULT IF PERSONNEL STAND
BETWEEN THE SUSPENDED LOAD AND THE MODULE LOCATED ON THE LAUNCH
FRAME.
Remove the R clips and bridge pins from the jaws of the rear of the 1st parallel module
4.9.3.40
and the front of the 2nd parallel module, place the pins on the tail lift platform.
NOTE
If due to the angle of the ramp module, the lower jaws connect first. Align the jaws and
the jaw alignment system. Jib forward with the crane so that the module rotates around
the jaws until the dowels are aligned. For further information refer to Chapter 3
Connecting Modules Where the Jaws Contact First.
Align the dowels of the 1st and 2nd parallel modules.
4.9.3.41
4-67