TM-5-5420-279-10
Table 8.2 Operators PMCS (Before)- (continued)
Location
Item
Not Fully Mission
Item to
Interval
Procedure
No.
Capable If:
Check
Service
4
1
2
3
55
Before
Deploy tilt
(a) Deploy tilt roller in accordance
roller
through 3.5.3.6.
(b) Ensure that tilt roller shootbolts
(1, 2 and 3) are not damaged.
(c) Check for hydraulic fluid leaks.
Class III leak evident.
(d) Operate tilt rollers (4) by use of
Tilt rollers operate
the left hand joystick, ensure that tilt
erratically.
rollers are in fully lowered position
after test.
56
Before
Bridge stop
(a) Check operation of both left and
Not free to move.
emergency
right bridge stop emergency
Handles do not
mechanisms.
return fully to their
upper position under
spring operation.
(b) Check rollers operate smoothly.
Rollers seized.
56.1
Before
Bridge stop
(a) Check all four rollers rotate freely.
Rollers seized.
rollers
(b) Check for signs of impact
Damage evident.
damage.