TM 5-5420-280-10
0001 00
GENERAL INFORMATION (Contd)
CBT LOADED WITH BRIDGE AND BRIDGE PALLET IS
BACKED INTO POSITION ON NEAR SHORE.
PIN WHEEL DRIVE UNIT ADVANCES LOWER BRIDGE HALF INTO COUPLING POSITION.
BRIDGE HALVES ARE COUPLED TOGETHER.
Figure 2. Depiction of Bridge Launch (1 of 2).
0001 00-2