TM 5-5420-280-10
0016 00
LAUNCH OF BRIDGE (Contd)
CAUTION
Failure to remove the launch boom retaining pins prior
to lowering launch boom or stowing retaining pins in
mounting holes of launch boom lock brackets will result
in damage to equipment.
NOTE
Operator and assistant will remove launch boom lock
retaining pins simultaneously to decrease launch time
g.
Loosen turnbuckle nut (14) as necessary, and remove retaining pin (11) from
launch boom lock (12) at both sides of pallet launch boom (13).
12
11
~
13
14
16. Depress LAUNCH button (5) to confirm and step into next function.
17. Depress ACTION 1 button (4) to L4-A-RETRACT WINCH CABLE, and observe
winch (10) lift upper bridge half (9) at ramp end.
L4-A-Retract winch cable
10
9
5
4
0016 00-11