TM 5-5420-280-10
0016 00
LAUNCH OF BRIDGE (Contd)
10. Depress LAUNCH button (5) to confirm and step into next function.
WARNING
Operators must wear hearing protection during LPU
start-up and when performing launch/retrieval
operations in close proximity to LPU. Failure to comply
may result in injury to personnel.
CAUTION
High idle switch must be in the OFF position prior to
engaging PTO. Failure to comply may result in damage
to vehicle transmission.
12. With HIGH IDLE switch (3) in OFF position, move PTO ENGAGE
switch (2) to ON position. PTO ENGAGE indicator (1) will light.
3
1
2
CBT CAB CONSOLE
CAUTION
Ensure that fastening rods are removed from upper
bridge half and transverse girders, or damage to
equipment will result.
Visually check to ensure bridge quarters on upper and
lower bridge halves are fully extended and slide locks on
lower bridge half are engaged or damage to equipment
may result.
NOTE
Operator and assistant will observe locked position
at each control lever simultaneausly to decrease
launch time.
13. Depress and hold ACTION 1 button (4) to L2-H-EXTEND BRIDGE TO
OPERATING WIDTH, and observe transverse handling unit telescopic
tubes (9) spread bridge quarters (7) and (8) on both bridge halves. Listen for
click and observe locked position at each control lever (6).
0016 00-8