TM 5-5420-280-10
0028 00
MANUALLY LOADING PALLET FROM GROUND (Contd)
22. Remove two pallet hold-down bars (4) from stowed position, and connect hook
(6) on each hold-down bar (4) to CBT towing shackles (7). Tighten both
hold-down bars (4) and jamnuts (5).
5
4
6
7
23. Install two transload rollers on fixed axles. Refer to WP 0007 00.
END OF WORK PACKAGE
0028 00-9/10 blank