TM 5-5420-280-10
0029 00
MANUALLY UNLOADING PALLET TO GROUND (Contd)
8. Remove two transload rollers from fixed axles and stow in pallet toolboxes.
NOTE
Perform step 9 if transload roller bar is installed on
lower support boom.
9. Remove transload roller bar from lower support boom and stow in either pallet
NOTE
Assistant will help install transload roller bar.
10. Disconnect pallet hold-down bar hook (16) from CBT towing shackle (17) at
each side of pallet frame (14), and place both hold-down bars (15) in stowed
15
14
16
17
NOTE
Perform steps 11 and 12 if bridge is on pallet and
auxiliary light bar is installed.
11. Remove auxiliary light bar (19) from pallet frame girders (18) by removing
safety strap (22) and releasing two clamps (23).
12. Disconnect power cable (21) from auxiliary light bar connector (20) and CBT
electrical connector (24).
24
19
18
21
20
21
23
22
0029 00-5